Predictive Maintenance for ExxonMobil: Upstream & Downstream Operations

BC2407 Analytics II | AY2023/24 Semester 2 | Team 1


Table of Contents

  1. Project Overview
  2. ExxonMobil Operational Context
  3. Part A: Upstream Prediction — Gas Turbine Failure in Cogeneration Plants
  4. Part B: Downstream Prediction — Refinery Process Equipment Failure
  5. Project Report Summary
  6. ExxonMobil Domain Knowledge & Industrial Implementation
  7. Technology Stack
  8. Repository Structure

1. Project Overview

This project develops a comprehensive machine learning-based predictive maintenance system spanning both upstream (gas turbine cogeneration) and downstream (refinery process equipment) operations for ExxonMobil's Singapore integrated refining and petrochemical complex — the world's largest of its kind.

Business Problem

ExxonMobil's Singapore facility operates at a capacity of 592,000 barrels per day, powered by a cogeneration plant running GE 9HA series gas turbines (605 MW, 62.22% thermodynamic efficiency). The facility's electricity consumption exceeds 440 MWh, far surpassing Singapore's mainland energy storage capacity of 200 MWh — meaning alternative power sources are unavailable during outage contingencies. A single hour of unplanned downtime costs over $100,000, and downstream profit fell by $50 million in Q2 2019 alone due to outages at three ExxonMobil refineries (Baytown, Canada, and Saudi Arabia). Unplanned CDU outages in Q2 2019 resulted in 16.4 million barrels of lost production.

Strategic Objective

Transition ExxonMobil's maintenance philosophy from reactive/preventive to predictive by deploying ML classifiers on sensor telemetry data from:

  • Upstream (Part A): GE 9HA gas turbines in the Jurong Island cogeneration plant — predicting turbine failure before it cascades into plant-wide power loss
  • Downstream (Part B): Critical refinery process equipment (crude distillation units, fluid catalytic cracking units, heat exchangers, compressors) — predicting equipment degradation and failure across the refining value chain

The dual-scope approach ensures end-to-end operational resilience: upstream prediction safeguards the power supply, while downstream prediction safeguards the process units that convert crude oil into high-value products.


2. ExxonMobil Operational Context

2.1 The Singapore Integrated Complex

ExxonMobil's Jurong Island facility is a vertically integrated refining and petrochemical complex comprising:

  • Refinery: 592,000 bbl/day crude distillation capacity — Singapore's largest, producing fuels, lubricants, and aromatics
  • Petrochemical plants: Ethylene crackers, polyethylene/polypropylene units, aromatics extraction, specialty chemicals
  • Cogeneration plant: GE 9HA combined-cycle gas turbines providing captive electricity and process steam to the entire complex
  • Marine terminal: Deep-water jetties handling VLCC tanker operations

The integration means a failure at any point — gas turbine trip, CDU shutdown, FCC malfunction — propagates across the entire value chain. A cogeneration plant trip blacks out the refinery; a CDU failure starves the FCC of feedstock; an FCC failure disrupts the petrochemical downstream.

2.2 Current Maintenance Framework

ExxonMobil operates under its Operations Integrity Management System (OIMS) — a proprietary framework established after the 1989 Exxon Valdez incident, comprising:

Framework Scope
Standards of Environmental Care (SOEC) Environmental protection across all operations
Global Pipeline Integrity (GPI) Pipeline corrosion monitoring and integrity management
Hydrocarbon Controls Procedures (HCP) Leak prevention and hydrocarbon containment
Safety Critical Equipment (SCE) Programme Classification and inspection of safety-critical assets
Rotor-In Major Inspection (RIMI) GE gas turbine maintenance without rotor removal (saves 30-40% labour hours)

Current gap: While ExxonMobil partnered with Microsoft Azure in 2019 for upstream drilling analytics and AI-driven oilfield optimisation, this cloud technology has not yet been deployed for downstream process equipment maintenance. The refinery and cogeneration plant still rely on scheduled (preventive) and reactive maintenance strategies.

2.3 Limitations of Existing Approach

Strategy Limitation ExxonMobil Impact
Reactive Maintenance Repairs only after breakdown Unplanned shutdowns cost >$100K/hour; safety incidents (e.g., 2017 Louisiana refinery explosion — OSHA citations issued)
Preventive Maintenance Fixed-interval inspections regardless of actual condition Over-maintenance: unnecessary teardowns increase planned downtime; Under-maintenance: 40% of failures still occur between scheduled inspections
RIMI Procedures Reduces but does not eliminate downtime Can only reduce outage labour by 30-40%; does not prevent the failure event itself

2.4 The Predictive Maintenance Opportunity

McKinsey & Company research indicates IoT-enabled predictive maintenance delivers:

  • 30% reduction in maintenance costs
  • 30% reduction in unplanned downtime
  • 20% extension in equipment lifespan

For ExxonMobil's Singapore complex operating at 592,000 bbl/day with crude at ~$75/bbl, even a 1% improvement in uptime translates to approximately $16.2 million/year in avoided lost production.


3. Part A: Upstream Prediction — Gas Turbine Failure in Cogeneration Plants

3.1 Problem Statement

Predict failure of GE 9HA series gas turbines in ExxonMobil's Jurong Island cogeneration plant using operational sensor data, enabling proactive maintenance scheduling before turbine trips cascade into plant-wide power outages.

3.2 Dataset

Source: Synthetic predictive maintenance dataset modelling GE H-series gas turbine operational data (UCI ML Repository: AI4I 2020 Predictive Maintenance Dataset)

Records: 10,000 data points | Features: 10

Feature Description Unit ExxonMobil Sensor Equivalent
UDI Unique identifier (1–10,000) SAP Equipment ID
Product ID Quality variant prefix (L/M/H) + serial Asset tag in Maximo/SAP PM
Type Machine quality variant: H (High), M (Medium), L (Low) Turbine frame classification
Air temperature [K] Ambient air intake temperature Kelvin Compressor inlet RTD (T1)
Process temperature [K] Hot gas path / exhaust temperature Kelvin Turbine exhaust thermocouple (T5)
Rotational speed [rpm] Shaft rotational speed RPM Shaft proximity probe / tachometer
Torque [Nm] Mechanical torque on shaft Nm Strain gauge / calculated from generator load
Tool wear [min] Cumulative operational wear time Minutes Equivalent Operating Hours (EOH) counter
Target Binary failure indicator: 0 = No Failure, 1 = Failure Trip/alarm event log from Mark VIe control system
Failure Type Failure mode (Heat Dissipation, Power, Overstrain, Tool Wear, Random) CMMS failure code taxonomy

3.3 Class Distribution

Class Count Percentage
No Failure (0) 9,661 96.6%
Failure (1) 339 3.4%

Severe class imbalance — reflective of real-world turbine operations where failures are rare but catastrophic events.

Machine Quality Variant Distribution

Type Count Percentage ExxonMobil Interpretation
L (Low quality) ~6,000 60% Standard-grade turbine components with baseline tolerance specs
M (Medium quality) ~3,000 30% Mid-grade components with enhanced coatings and alloys
H (High quality) ~1,000 10% Premium single-crystal blade alloys, advanced TBC coatings

3.4 Data Preprocessing Pipeline

Step 1: Data Ingestion & Cleaning

  • Loaded via data.table::fread() with column renaming for programmatic access
  • Verified zero missing values across all features
  • Removed non-predictive identifiers (UDI, Product ID) and Failure Type label (prevents target leakage)

Step 2: Class Imbalance Treatment — Random Undersampling

  • Undersampled majority class (9,661 non-failure) to match minority class (339 failure)
  • Resulting balanced dataset: ~678 records (339 per class)
  • Rationale: In cogeneration operations, the cost of a missed turbine trip (false negative) — cascading plant-wide blackout, emergency shutdown of CDUs/FCC, flaring, potential safety incident — vastly exceeds the cost of an unnecessary inspection (false positive). Undersampling forces models to learn genuine failure patterns rather than trivially predicting "no failure" for 96.6% accuracy.

Step 3: Skewness Correction

  • Assessed all continuous features using moments::skewness()
  • Rotational_speed_rpm exhibited high positive skew (2.73) — corrected via log transformation to 2.11
  • Remaining features: within acceptable skewness bounds
  • Note: Selected models without normality assumptions given residual skewness

Step 4: Feature Engineering

  • One-hot encoding of Type into binary columns: TypeH, TypeL, TypeM
  • Min-Max normalisation (0–1 scaling) on all continuous features:
    • Air_temperature_K, Process_temperature_K, Rotational_speed_rpm (log), Torque_nm, Tool_wear_min

Step 5: Train-Test Split

  • 70/30 stratified split via caTools::sample.split() on Target
  • Random seed: 100 (reproducibility)

3.5 Models Evaluated

Ten model configurations were trained, evaluated, and benchmarked:

# Model Category Key Configuration
1 Logistic Regression (Baseline) Linear GLM, binomial family
2 Support Vector Machine Cluster-based C-classification, linear kernel
3 CART Decision Tree Tree-based Maximal tree grown (minsplit=2, cp=0), pruned via 1-SE rule
4 Random Forest Ensemble (Bagging) ntree = 30
5 10-Fold CV Random Forest Ensemble + CV ntree = 30, k = 10
6 Ridge Regression Regularised Linear alpha = 0, lambda optimised via CV
7 Lasso Regression Regularised Linear alpha = 1, lambda optimised via CV
8 XGBoost Gradient Boosting nrounds = 10, binary:logistic, error metric
9 10-Fold CV XGBoost Gradient Boosting + CV nrounds = 10, binary:hinge, k = 10
10 Neural Network Deep Learning 4 hidden layers (6-6-4-2), cross-entropy loss, stepmax = 1M

3.6 Evaluation Metrics

Metric Formula / Description Why It Matters for Gas Turbines
F1 Score (Primary) Harmonic mean of Precision & Recall Balances false alarms (unnecessary shutdowns) vs. missed failures (catastrophic trips)
F2 Score Weighted F-beta (beta=2), emphasises Recall Penalises missed failures more heavily — critical because a turbine trip costs >$100K/hour vs. an unnecessary inspection costing ~$5K
Accuracy (TP+TN) / Total Overall correctness; less meaningful under class imbalance
Log Loss -[y*log(p) + (1-y)*log(1-p)] Measures probabilistic calibration — important for confidence-tiered alerting (yellow vs. red alarms)

3.7 Results

Method Model Accuracy F1 Score F2 Score Log Loss
Linear Logistic Regression (Baseline) 0.804 0.810 0.824 16.955
Cluster-based Support Vector Machine 0.799 0.800 0.802 -34.540
Regularised Linear Ridge Regression 0.804 0.802 0.797 17.320
Regularised Linear Lasso Regression 0.804 0.810 0.824 17.320
Tree-based CART 0.931 0.933 0.950 17.025
Ensemble (Bagging) Random Forest 0.931 0.934 0.956 17.016
Ensemble + CV 10-Fold Random Forest 0.930 0.934 0.956 17.016
Deep Learning Neural Network 0.858 0.863 0.880 5.086
Gradient Boosting XGBoost 0.936 0.938 0.957 16.609
Gradient Boosting + CV 10-Fold XGBoost 0.971 0.938 0.957 16.609

3.8 Key Findings — Upstream

Variable Importance (Consistent Across CART, Random Forest, and XGBoost)

Rank Feature CART Variable Importance RF Mean Decrease Gini Interpretation
1 Rotational speed (RPM) ~100 (highest) 65.0 Primary split at normalised speed >= 0.18; low speed = compressor stall/bearing degradation
2 Torque (Nm) ~95 67.0 High torque + low speed = mechanical overload; inverse relationship with RPM confirmed in EDA
3 Tool wear (min) ~48 42.0 Cumulative degradation proxy; failure threshold at >78th percentile normalised wear
4 Air temperature (K) ~18 25.0 Ambient conditions affect compressor inlet density and turbine cooling effectiveness
5 Process temperature (K) ~5 17.0 Hot gas path temperature; less discriminative as standalone feature
6-8 Type (H/L/M) Negligible 1-3 each Quality variant has minimal standalone predictive power

CART Decision Tree — Interpretable Failure Rules

The optimal pruned CART model (after 1-SE rule pruning) reveals rules directly translatable to gas turbine alarm setpoints:

Rule 1: IF Rotational_speed_rpm < 0.18 (normalised) → 85% probability of failure
        [Maps to: turbine operating significantly below rated speed — compressor surge/stall zone]

Rule 2: IF Rotational_speed_rpm >= 0.18 AND Tool_wear_min >= 0.81 → failure predicted
        [Maps to: turbine at normal speed but approaching overhaul interval]

Rule 3: IF Rotational_speed_rpm < 0.18 AND Torque_nm >= 0.68 → failure predicted
        [Maps to: high mechanical load at low speed — bearing/gearbox distress]

Rule 4: IF Rotational_speed_rpm < 0.18 AND Torque_nm < 0.68 AND Air_temp >= 0.66 → investigate
        [Maps to: hot-day low-speed operation — reduced cooling margin]

Selected Model: XGBoost

XGBoost was selected as the final upstream model based on:

  • Highest F1 Score (0.938) — best balance of precision and recall
  • Highest F2 Score (0.957) — strongest recall performance (fewest missed failures)
  • Highest accuracy (0.971 with 10-fold CV) — most stable generalisation
  • Computational efficiency — gradient boosting is well-suited for real-time inference on edge devices
  • Log Loss (16.609) — acceptable probabilistic calibration for alert tiering

Note: While Neural Networks achieved the best Log Loss (5.086) indicating superior probabilistic calibration, their lower F1/F2 scores and the "black box" interpretability concern led to XGBoost being preferred for operational deployment. The report recommends a human-in-the-loop approach where XGBoost predictions serve as a complementary decision support tool alongside engineer judgement.

3.9 Upstream Operational Monitoring Recommendations

Based on the variable importance findings, the following real-time monitoring priorities should be established for ExxonMobil's cogeneration gas turbines:

  • Rotational speed monitoring on gas turbines, compressors, and pumps should be the primary trigger for predictive maintenance alerts. Speed deviations from baseline are the single most predictive failure indicator — the CART root split at normalised RPM >= 0.18 translates directly to a low-speed alarm threshold on the Mark VIe control system.
  • Torque-speed relationship monitoring enables detection of mechanical binding, bearing wear, and compressor surge conditions before catastrophic failure. The confirmed inverse relationship between torque and RPM means that a simultaneous high-torque / low-speed condition should trigger an immediate "orange" alert.
  • Cumulative runtime tracking supports condition-based overhaul scheduling rather than fixed-interval maintenance, reducing unnecessary teardowns on healthy equipment. The CART model's wear threshold at the 78th percentile provides an evidence-based trigger for scheduling the next RIMI inspection.

3.10 Upstream Deployment Recommendations

  1. Edge deployment of the XGBoost model on existing RTU/PLC infrastructure or the GE Mark VIe turbine control system, enabling sub-second inference without cloud latency for safety-critical trip prevention
  2. Integration with OSIsoft PI historian for real-time feature extraction from existing sensor tags — the PI-to-Azure connector enables dual-path scoring (edge for real-time, cloud for batch retraining)
  3. Alert tiering using probability thresholds to generate confidence-graded maintenance work orders in SAP PM/Maximo:
    • P(fail) > 0.3 → Yellow: "Investigate — review sensor trends"
    • P(fail) > 0.5 → Orange: "Schedule maintenance within next planned window"
    • P(fail) > 0.8 → Red: "Immediate action — prepare for controlled shutdown"
  4. Continuous retraining pipeline using actual failure records from the CMMS to improve model accuracy over time and prevent concept drift as turbine ageing progresses
  5. CART decision rules as field pocket cards — the interpretable tree rules (Section 3.8) should be printed as laminated pocket reference cards for field technicians and control room operators, providing an immediate human-interpretable cross-check against the XGBoost probability output

4. Part B: Downstream Prediction — Refinery Process Equipment Failure

4.1 Problem Statement

Predict failure of critical refinery process equipment across ExxonMobil's Singapore downstream complex — including crude distillation units (CDUs), fluid catalytic cracking (FCC) units, hydrotreaters, reformers, heat exchangers, and rotating equipment (pumps, compressors) — using process sensor data and historical maintenance records.

While the upstream model (Part A) protects the power supply to the refinery, the downstream model addresses the process units themselves. A CDU failure at ExxonMobil's Singapore refinery impacts 592,000 bbl/day throughput; an FCC failure disrupts gasoline and petrochemical feedstock production; a heat exchanger tube leak can force an unplanned unit shutdown with environmental release risk.

4.2 ExxonMobil Downstream Asset Landscape

ExxonMobil's Singapore refinery operates the following critical process units, each with distinct failure modes and sensor signatures:

Process Unit Function Capacity Critical Failure Modes Key Sensor Inputs
Crude Distillation Unit (CDU) Primary crude oil separation into fractions 592,000 bbl/day Tray fouling, overhead condenser corrosion, furnace tube coking, column flooding Column delta-P, tray temperatures, overhead reflux ratio, furnace tube metal temps
Vacuum Distillation Unit (VDU) Heavy residue separation under vacuum ~200,000 bbl/day Ejector malfunction, vacuum loss, coking in transfer line Vacuum pressure, ejector steam flow, heater outlet temperature
Fluid Catalytic Cracker (FCC) Converts heavy gas oil to gasoline/LPG ~150,000 bbl/day Catalyst attrition, regenerator afterburn, cyclone erosion, slide valve failure Riser temperature, regenerator dense bed temp, catalyst circulation rate, flue gas O2/CO
Hydrocracker/Hydrotreater Sulfur removal, heavy oil conversion ~100,000 bbl/day Catalyst deactivation, reactor bed channelling, hydrogen compressor failure Reactor delta-T across beds, H2 partial pressure, WABT, compressor vibration
Catalytic Reformer Naphtha upgrading to high-octane reformate ~80,000 bbl/day Catalyst coking, chloride loss, heater tube failure Reactor inlet/outlet temps, H2/HC ratio, chloride in recycle gas, pressure drop
Heat Exchangers (100s of units) Heat integration across all process units Tube leak, fouling, corrosion under insulation (CUI) Shell/tube delta-T, fouling factor trend, pressure drop, vibration
Centrifugal Pumps (1000s of units) Fluid transfer across all process units Seal failure, bearing wear, impeller erosion, cavitation Vibration (axial/radial), bearing temperature, suction pressure, discharge flow
Reciprocating/Centrifugal Compressors Gas compression (H2, process gas, refrigerant) Valve failure, piston ring wear, surge, bearing distress Vibration, rod drop, discharge temperature, suction/discharge pressure, surge margin

4.3 Downstream Dataset Design

The downstream prediction task extends the upstream methodology to refinery-specific sensor telemetry. The dataset would be sourced from ExxonMobil's OSIsoft PI historian (or equivalent DCS/SCADA data archive) and SAP PM/Maximo CMMS work order records.

Proposed Feature Set

Feature Category Features Source System Sampling Rate
Process Variables Column temperatures (top/mid/bottom), pressure drops, flow rates, reflux ratios, heat duties DCS (Honeywell Experion / Yokogawa CENTUM VP) 1-second scans, aggregated to 1-minute averages
Rotating Equipment Vibration (velocity, acceleration, displacement), bearing temperatures, seal pressures, motor current Online condition monitoring (Bently Nevada / SKF) Continuous (1-second)
Corrosion & Integrity Ultrasonic wall thickness, corrosion coupon rates, ER probe readings, CUI thermal imaging Integrity management system Daily/weekly scans
Operational Context Throughput (bbl/day), feed quality (API gravity, sulfur content, TAN), ambient temperature, days since last turnaround PI historian, LIMS, planning system Hourly / per-crude-assay
Maintenance History Days since last overhaul, cumulative run hours, number of past failures, last work order type SAP PM / Maximo Event-driven
Target Variable Binary: equipment failure within next N operating days (e.g., N=7, 14, 30) CMMS failure notifications + operator logs Event-driven

Expected Dataset Characteristics

Characteristic Upstream (Gas Turbine) Downstream (Refinery Equipment)
Records 10,000 50,000–500,000+ (multiple units, years of historian data)
Features 10 30–100+ (process variables per unit type)
Failure rate 3.4% 1–5% (varies by equipment class; heat exchangers ~2%, pumps ~4%, compressors ~3%)
Temporal structure Independent events Time-series with autocorrelation — requires windowed feature engineering
Multi-class potential 5 failure types 10–20+ failure modes per equipment class
Data quality challenges Clean synthetic data Missing values, sensor drift, tag decommissions, unit outage gaps

4.4 Downstream Preprocessing Pipeline

Building on the upstream methodology, the downstream pipeline incorporates additional complexity inherent to refinery operations:

Step 1: Data Extraction & Integration

  • Extract process historian data (PI/DCS) at 1-minute resolution for target equipment
  • Join with CMMS work order data to label failure events (target variable creation)
  • Join with LIMS data for crude feed quality features
  • Challenge: Data alignment across disparate systems with different timestamps and sampling rates

Step 2: Temporal Feature Engineering

Unlike the upstream dataset (independent records), refinery sensor data is time-series — requiring:

  • Rolling window statistics: 1hr, 8hr, 24hr, 7-day rolling mean, std, min, max for each sensor tag
  • Rate-of-change features: First derivatives of key process variables (delta-T/hour, delta-P/hour)
  • Cumulative degradation indicators: Fouling factor trend slope, cumulative vibration energy above baseline
  • Operational regime detection: Startup, steady-state, turndown, shutdown classification

Step 3: Class Imbalance Treatment

  • SMOTE (Synthetic Minority Oversampling) preferred over undersampling for larger downstream datasets — retains more training information
  • Cost-sensitive learning weights in XGBoost: scale_pos_weight = (negative count / positive count)
  • Sliding window prediction: Predict failure in next N days, with N tuned per equipment class based on maintenance lead time

Step 4: Multi-Equipment Modelling Strategy

Approach Description Use Case
Equipment-specific models Separate model per equipment class (CDU model, pump model, etc.) When failure signatures differ fundamentally between equipment types
Federated/Transfer learning Pre-train on one unit, fine-tune on similar units Leverage data from multiple similar compressors or pumps across the complex
Hierarchical model Unit-level model feeds into plant-level availability prediction Aggregate risk scoring for turnaround planning

4.5 Downstream Models

The same model families evaluated in the upstream analysis would be applied, with extensions for time-series and larger datasets:

Model Upstream Config Downstream Extension
Logistic Regression Standard GLM Regularised (elastic net) with temporal features
CART / Random Forest ntree=30, Gini splits Larger forests (ntree=500+), deeper trees, feature selection via Boruta
XGBoost nrounds=10 nrounds=500+, Bayesian hyperparameter tuning, early stopping
Neural Network 4-layer MLP (6-6-4-2) LSTM / CNN-LSTM hybrid for temporal pattern recognition
Additional: Isolation Forest N/A Unsupervised anomaly detection for novel failure modes
Additional: Survival Analysis N/A Time-to-failure prediction (Cox PH / DeepSurv) for remaining useful life estimation

4.6 Expected Downstream Results & Failure Signatures

Based on ExxonMobil domain knowledge and published refinery predictive maintenance benchmarks:

CDU / Distillation Columns

  • Primary failure predictor: Column differential pressure trend (fouling progression follows a characteristic exponential curve)
  • Secondary: Overhead condenser duty decline, tray temperature profile distortion
  • Expected model accuracy: 85–92% (fouling is gradual and highly predictable)
  • Lead time achievable: 2–4 weeks before throughput impact

FCC Unit

  • Primary failure predictor: Regenerator dense bed temperature excursion + catalyst-to-oil ratio deviation
  • Secondary: Cyclone pressure drop increase (erosion), slide valve differential pressure instability
  • Expected model accuracy: 80–88% (more complex multi-mode failure landscape)
  • Lead time achievable: 3–7 days for catalyst issues; hours for mechanical failures

Heat Exchangers

  • Primary failure predictor: Fouling factor trend (UA degradation rate), approach temperature increase
  • Secondary: Shell-side pressure drop increase, tube-side outlet temperature deviation from design
  • Expected model accuracy: 88–94% (fouling is the dominant, highly predictable failure mode)
  • Lead time achievable: 1–6 months (fouling is slow; cleaning can be scheduled during planned outages)

Rotating Equipment (Pumps & Compressors)

  • Primary failure predictor: Vibration signature change (amplitude, frequency spectrum shift) — directly analogous to upstream torque/RPM findings
  • Secondary: Bearing temperature trend, seal oil delta-P, motor current draw
  • Expected model accuracy: 90–95% (vibration-based diagnostics is the most mature PDM discipline)
  • Lead time achievable: 1–4 weeks for bearing wear; hours for seal failures

4.7 Downstream-Specific Considerations

Turnaround (TAR) Planning Integration

ExxonMobil's Singapore refinery undergoes major turnarounds every 4–6 years per unit, with TARs typically lasting 30–45 days and costing $50–200M per event. Downstream predictive maintenance models feed directly into TAR scope optimisation:

  • Equipment predicted to survive until the next TAR can be deferred (avoiding unnecessary mid-cycle shutdowns)
  • Equipment showing accelerating degradation can be pulled into the TAR scope (avoiding unplanned outage before the next TAR)
  • Remaining Useful Life (RUL) estimates from survival models directly inform the TAR scheduling window

Crude Slate Sensitivity

Unlike upstream turbines running on consistent natural gas, downstream equipment condition is heavily influenced by crude oil quality changes:

  • High-TAN (Total Acid Number) crudes accelerate naphthenic acid corrosion in CDU overheads
  • High-sulfur crudes increase hydrotreater catalyst deactivation rates
  • Opportunity crudes with high asphaltene content accelerate heat exchanger fouling
  • Implication: Crude assay data must be included as a model feature; models must handle concept drift as crude slates change

Safety & Environmental Regulatory Context

ExxonMobil operates under Singapore's Workplace Safety and Health Act and Environmental Protection and Management Act. Equipment failures in downstream units carry regulatory consequences:

  • Flaring during emergency shutdowns triggers NEA (National Environment Agency) reporting requirements
  • Hydrocarbon releases require MOM (Ministry of Manpower) incident reporting
  • Predictive maintenance reduces both safety incidents and regulatory exposure — the report notes that 30%+ of major O&G accidents are triggered by inadequate maintenance (Nwankwo et al., 2021)

5. Project Report Summary

5.1 Executive Summary (from report)

The report proposes integrating ML-based predictive maintenance with ExxonMobil's existing OIMS maintenance framework to reduce unplanned downtime in the Singapore cogeneration and downstream complex. XGBoost was selected as the final model (highest accuracy: 0.971, highest F1: 0.938, highest F2: 0.957) for deployment via a Microsoft Azure cloud architecture with a human-in-the-loop decision framework.

5.2 Key Report Findings

Model Performance Hierarchy

  1. Non-linear models decisively outperform linear models — CART (0.933 F1) through XGBoost (0.938 F1) vs. Logistic Regression (0.810 F1), confirming that turbine failure is governed by non-linear interactions between operating variables
  2. Ensemble methods provide the best accuracy-stability trade-off — Random Forest and XGBoost both exceed 0.93 F1; 10-fold CV XGBoost achieves 0.971 accuracy
  3. Neural Networks excel at probabilistic calibration (Log Loss: 5.086 vs. 16+ for all other models) but underperform on F1/F2, likely due to insufficient training data (678 balanced records) for the 4-layer architecture
  4. Linear models (Logistic, SVM, Ridge, Lasso) plateau at ~0.80 F1 — confirming the failure decision boundary is fundamentally non-linear

Variable Importance Consensus

All tree-based and ensemble models agree:

  • Rotational speed and torque are the dominant predictors (combined importance >60% across all models)
  • Their inverse relationship (confirmed in EDA) is the key failure signature: high torque at low speed = mechanical distress
  • Tool wear (cumulative operating hours) acts as a degradation accumulator
  • Temperature features are secondary contributors
  • Machine type adds minimal predictive power as a standalone feature

Interpretability vs. Accuracy Trade-off

The report explicitly addresses the "black box" problem for industrial deployment:

  • CART provides human-readable rules directly translatable to alarm setpoints — recommended for field engineer decision support
  • XGBoost provides highest accuracy but requires trust-building via the proposed human-in-the-loop framework — recommended for control room automated alerting
  • 42% of analytics results go unused by business decision-makers (SAS survey cited in report) — the human-in-the-loop approach is essential for adoption

5.3 Proposed Implementation Architecture (from report)

[Gas Turbine Sensors] → [Azure IoT Hub] → [Azure Data Explorer] → [XGBoost Model] → [Azure Monitor Alerts]
        |                                          |                        |                    |
        |                                    [PI Historian]           [Probability Score]   [Control Room]
        |                                          |                        |                    |
        └── Torque, RPM, Temp,              [Dashboard/PBI]          [Human-in-the-Loop]  [Work Order in
            Wear sensors                                              Engineer Review       SAP PM/Maximo]

Two-factor authentication for maintenance decisions:

  1. Factor 1: XGBoost model probability score (>50% = alert, confidence-tiered)
  2. Factor 2: Engineer's domain expertise validation — reviewing specific sensor trends (especially torque-speed relationship) before confirming maintenance scheduling

5.4 Report Limitations Acknowledged

Limitation Impact Proposed Mitigation
Missing dynamic features Dataset lacks turbine age, operational hours, maintenance history, seasonal variables Additional data collection from CMMS and historian; include seasonality features
Seasonal variation Model trained on potentially single-season data; summer vs. winter operating conditions differ significantly Collect multi-year seasonal data; retrain models periodically to prevent concept drift
Spurious correlations Variable importance shows correlation, not causation; confounders may exist Pilot study with domain experts; validate findings against mechanical engineering first principles
Synthetic dataset Data is generated, not from actual ExxonMobil turbines Retrain on real operational data before production deployment

5.5 Alternative Advanced Methods Proposed

Method Application Advantage over Current Models
CNN-LSTM Hybrid Time-series classification of sequential sensor data Captures temporal dependencies (current models treat records as independent)
Deep Reinforcement Learning (DRL) Optimise dynamic maintenance scheduling Learns optimal maintenance actions via Markov Decision Process; minimises total cost over time
Ensemble of Ensembles Combine XGBoost + LSTM + domain rules Leverages strengths of multiple paradigms

5.6 Value Proposition (from report)

Stakeholder Value
ExxonMobil Management Reduced unplanned downtime, optimised maintenance spend, increased asset utilisation, strategic resource allocation
Workers Reduced workplace accident risk from turbine malfunctions in high-energy cogeneration facilities
Engineers Variable importance insights for targeted sensor monitoring; hidden pattern discovery augments domain expertise
Singapore Government Economic stability (25% of manufacturing output from energy/chemicals), environmental protection (reduced flaring/releases), geopolitical energy security (Singapore as Asia's oil trading hub)

6. ExxonMobil Domain Knowledge & Industrial Implementation

6.1 ExxonMobil's Digital Transformation Journey

ExxonMobil's adoption of predictive analytics fits within a broader digital transformation roadmap:

Year Milestone Scope
2019 Microsoft Azure partnership Cloud computing for upstream drilling optimisation, AI-driven completions, leak detection
2020 Digital twin programme Real-time simulation of refinery process units for "what-if" scenario testing
2021 Advanced process control (APC) expansion Model predictive control (MPC) on CDUs, FCCs — optimises yield/energy in real-time
2022 OIMS digital integration Digitisation of integrity management records, mobile inspection workflows
2023 Enterprise data lake (Azure Synapse) Centralised data platform aggregating PI historian, LIMS, SAP, and drone/satellite imagery
Proposed Predictive maintenance deployment ML-based failure prediction integrated with Azure IoT + OIMS framework

6.2 Operational Integrity Management System (OIMS) Integration

The predictive maintenance system must integrate within ExxonMobil's 11 OIMS elements:

OIMS Element Predictive Maintenance Integration Point
1. Management Leadership Executive dashboard showing plant-wide equipment health scores and predicted failure risk
2. Risk Assessment ML-predicted failure probabilities feed into quantitative risk assessments for Process Hazard Analysis (PHA)
3. Facilities Design Historical failure pattern data informs design improvements during turnarounds and capital projects
4. Information/Documentation Model predictions, engineer overrides, and outcomes logged in CMMS for continuous improvement
5. Personnel & Training Control room operators and maintenance engineers trained on interpreting model outputs and CART decision rules
6. Operations & Maintenance Core integration point: Automated work order generation in SAP PM based on predicted failure probability thresholds
7. Management of Change (MOC) Model retraining, threshold changes, and new sensor additions governed under MOC procedures
8. Third-Party Services Model predictions shared with GE FieldCore for coordinating RIMI inspections and parts procurement
9. Incident Investigation Post-failure analysis compares model predictions against actual failure events for continuous improvement
10. Community Awareness Reduced flaring and emergency venting from prevented unplanned shutdowns improves community relations
11. Operations Integrity Assessment Annual model performance audit (accuracy drift, false negative rate trending) as part of OIMS self-assessment

6.3 ExxonMobil-Specific Technical Architecture

Sensor Infrastructure (Already Deployed)

ExxonMobil's Singapore complex already has comprehensive instrumentation:

System Vendor Data Points Sampling
DCS (Distributed Control System) Honeywell Experion / Yokogawa ~50,000 process I/O tags 1-second scan
SIS (Safety Instrumented System) Triconex ~5,000 safety-critical I/O Continuous
Vibration monitoring Bently Nevada (GE) / SKF ~2,000 rotating equipment channels Continuous
Gas turbine control GE Mark VIe ~500 per turbine 100ms scan
Corrosion monitoring Emerson/Honeywell ER probes ~200 corrosion loops Hourly
Data historian OSIsoft PI System Aggregates all above Configurable (typically 1-min average)

Key insight: The data infrastructure for predictive maintenance already exists — the missing component is the analytics layer (ML models + alerting logic) that this project provides.

Proposed Production Architecture

┌─────────────────────────────────────────────────────────────────────────────┐
│                        ExxonMobil Singapore Complex                         │
│                                                                             │
│  [GE 9HA Turbines]  [CDU/FCC/HCU]  [Pumps/Compressors]  [Heat Exchangers] │
│         │                  │                │                    │           │
│    [Mark VIe]         [DCS Tags]     [Bently Nevada]      [ER Probes]      │
│         │                  │                │                    │           │
│         └──────────────────┴────────────────┴────────────────────┘          │
│                                    │                                        │
│                          [OSIsoft PI Historian]                              │
│                                    │                                        │
│              ┌─────────────────────┼────────────────────┐                   │
│              │                     │                    │                    │
│        [PI-to-Azure          [SAP PM/Maximo]     [LIMS Crude               │
│         Connector]            Work Orders         Assay Data]              │
└──────────────┼─────────────────────┼────────────────────┼───────────────────┘
               │                     │                    │
               ▼                     ▼                    ▼
┌──────────────────────────────────────────────────────────────────────────────┐
│                          Microsoft Azure Cloud                               │
│                                                                              │
│  [Azure IoT Hub] → [Azure Data Explorer] → [Azure Synapse Analytics]        │
│                              │                        │                      │
│                     [Feature Engineering]    [Model Training Pipeline]        │
│                     (rolling stats, RoC,     (Azure ML: XGBoost, LSTM,       │
│                      regime detection)        Random Forest)                 │
│                              │                        │                      │
│                     [Real-time Scoring] ←─── [Model Registry]                │
│                              │                                               │
│                     [Azure Monitor Alerts]                                    │
│                      ├── Yellow: P(fail) > 0.3 → "Investigate"              │
│                      ├── Orange: P(fail) > 0.5 → "Schedule Maintenance"     │
│                      └── Red:    P(fail) > 0.8 → "Immediate Action"         │
│                              │                                               │
│                     [Power BI Dashboard]                                      │
│                     (Equipment health scores,                                │
│                      trend charts, failure                                    │
│                      probability heatmaps)                                   │
└──────────────────────┬───────────────────────────────────────────────────────┘
                       │
                       ▼
┌──────────────────────────────────────────────────────────────────────────────┐
│                    ExxonMobil Control Room / Maintenance Dept                 │
│                                                                              │
│  [Human-in-the-Loop Review] → [SAP PM Work Order Creation] → [Field Crew]   │
│                                                                              │
│  Two-Factor Decision:                                                        │
│  1. XGBoost probability + CART interpretable rules                           │
│  2. Engineer domain validation (sensor trend review)                         │
│                                                                              │
│  Feedback loop: Actual outcomes logged → Model retraining trigger            │
└──────────────────────────────────────────────────────────────────────────────┘

6.4 Cost-Benefit Analysis

Conservative Estimate for ExxonMobil Singapore

Parameter Value Source
Refinery capacity 592,000 bbl/day ExxonMobil public filings
Gross refining margin (Singapore) ~$8–12/bbl Platts benchmark
Revenue at risk per day of downtime $4.7M–$7.1M Capacity x margin
Average unplanned downtime events/year 3–5 (industry average) Wood Mackenzie
Average duration per event 3–7 days ExxonMobil 2019 Q2 earnings report
Annual cost of unplanned downtime $42M–$250M Range estimate
Predictive maintenance cost reduction 30% (McKinsey) Industry benchmark
Estimated annual savings $12.6M–$75M Conservative to optimistic
Implementation cost (Year 1) $3M–$8M Azure infrastructure + model development + integration
ROI (Year 1) 3:1 to 9:1 Conservative estimate

6.5 Failure Mode Mapping to Model Features

Upstream (Gas Turbine) — Failure Physics

Failure Type in Dataset Physical Mechanism Key Sensor Signature ExxonMobil Action
Heat Dissipation Failure Insufficient cooling; hot gas path over-temperature Process temp >> Air temp spread widens Check cooling air passages, inspect TBC coating
Power Failure Loss of electrical generation capacity RPM drop + torque fluctuation Generator inspection, exciter system check
Overstrain Failure Mechanical overload beyond design limits High torque + low RPM simultaneously Reduce load, inspect bearings/gearbox, check alignment
Tool Wear Failure Cumulative component degradation Tool wear exceeds threshold + other variables deteriorating Schedule RIMI, replace hot-section components
Random Failure Stochastic events (FOD, manufacturing defects) No clear sensor precursor Hardest to predict; ensemble models capture weak signals

Downstream (Refinery Equipment) — Failure Physics

Equipment Dominant Failure Mode Physical Mechanism Predictive Signal
CDU Overhead corrosion HCl condensation in overhead system from chloride in crude Overhead pH trending down, iron counts in overhead water rising
CDU Furnace tube coking Thermal cracking deposits on tube ID Tube metal temperatures rising, pass flow imbalance increasing
FCC Catalyst deactivation Heavy metals (Ni, V) poisoning + hydrothermal deactivation Conversion dropping at constant severity, catalyst addition rate increasing
FCC Regenerator afterburn Incomplete coke burn in dense bed, CO burning in dilute phase Dilute phase temp spike, CO/CO2 ratio shift
Heat Exchanger Fouling Deposition of asphaltenes, salts, corrosion products UA declining, approach temperature increasing on predictable curve
Pump Bearing wear Lubrication degradation, misalignment, imbalance Vibration amplitude increase at 1x, 2x running speed; bearing temp trend
Compressor Surge Operating point moves left of surge line Discharge pressure oscillation, anti-surge valve opening frequency

7. Technology Stack

Component Upstream (Implemented) Downstream (Proposed Extension)
Language R (v4.x) R + Python (scikit-learn, TensorFlow/PyTorch for LSTM)
Data Handling data.table data.table + pandas + Apache Spark (for historian-scale data)
Visualisation ggplot2, rpart.plot ggplot2 + plotly + Power BI dashboards
Statistical Analysis moments (skewness) moments + tseries (stationarity tests) + forecast (time-series decomposition)
ML Models glm, e1071, rpart, randomForest, glmnet, xgboost, neuralnet Same + keras/torch (LSTM/CNN), survival (Cox PH), isotree (Isolation Forest)
Model Evaluation MLmetrics, caret MLmetrics, caret + PRROC (PR curves), survminer (survival curves)
Data Splitting caTools caTools + time-aware train/test splitting (no future leakage)
BI Dashboard Power BI (BC2407 PBI2.pbix) Power BI + Azure Monitor dashboards
Cloud Infrastructure Local R environment Azure IoT Hub + Azure Data Explorer + Azure ML
Data Historian CSV flat file OSIsoft PI → Azure Data Explorer connector
CMMS Integration N/A SAP PM / Maximo API for automated work order generation

8. Repository Structure

Predictive_Maintenance_Upstream_Downstream/
│
├── BC2407 Project (for group) v29-2-2024 upstream.R    # Part A: Upstream gas turbine ML pipeline
│                                                         # (Logistic Reg, SVM, CART, RF, Ridge/Lasso,
│                                                         #  XGBoost, Neural Network)
│
├── predictive_maintenance.csv                            # Source dataset: 10,000 GE 9HA turbine records
│
├── BC2407 Project.docx                                   # Full project report (11 sections + appendices)
│                                                         # Executive summary, methodology, model results,
│                                                         # industrial implementation, limitations,
│                                                         # alternative methods, value proposition
│
├── BC2407 Dataset Description.docx                       # Dataset documentation & data dictionary
│                                                         # GE 9HA series turbine context
│
├── BC2407 PBI2.pbix                                      # Power BI dashboard
│                                                         # Variable distributions, summary statistics,
│                                                         # per-variable deep-dive pages
│
├── Diagrams/
│   ├── Frequency Barplot for Power Turbine Failure.png   # Target class distribution (96.6% vs 3.4%)
│   ├── Frequency Barplot of Power Turbine Quality Variant.png  # Machine type: L(60%), M(30%), H(10%)
│   ├── Optimal CART Model.png                            # Pruned CART tree (RPM >= 0.18 as root split)
│   ├── Variable Importance Bar Chart.png                 # CART: RPM > Torque > Wear > AirTemp > ProcTemp
│   ├── Variable Importance Plot.png                      # RF MeanDecreaseGini: Torque ≈ RPM >> Wear
│   └── Neural Net.pdf                                    # Neural network architecture (8→6→6→4→2→1)
│
└── PROJECT_DESCRIPTION.md                                # This file

This project was developed as part of NTU BC2407 Analytics II (AY2023/24 Semester 2), framed within the operational context of ExxonMobil's Singapore integrated refining and petrochemical complex. The upstream prediction model (Part A) is fully implemented in R. The downstream prediction framework (Part B) represents the natural extension to refinery process equipment, designed based on ExxonMobil operational domain knowledge and industry best practices for refinery predictive maintenance.

About

No description or website provided.

Topics

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages